    Continued good news from this great project and great management team.

    Q - Do we think with these proven engineering enhancements, the EFS might look to start production at the 2.45mil tpa level straight up? Previously they had advised a 3 phase start up process. Start at 1.8mil tpa, then later on to 2.4 tpa and then lastly to full permit size of 3.2 tpa. Wondering now if they intend to begin straight away with stage 2 production levels. That would be a 35% increase to initial production. I suppose we will find out soon enough when the EFS is released.