THB 0.00% 2.7¢ thunderbird resources limited

Ann: Hook Lake Project - Exploration Update, page-49

  1. 2,782 Posts.
    lightbulb Created with Sketch. 609
    So we have Pitchblende protruding out of the ground. Uraninite. Surface samples of VERY high grade U and There will be drilling in vicinity of these outcrops. The trench has been sampled many times and results are consistent.
    could the deeps resemble this???
    https://hotcopper.com.au/data/attachments/3662/3662257-228b9c167ba9a43589fe9b4d9d66ef0b.jpg
    Last edited by oilskin: 07/10/21
 
watchlist Created with Sketch. Add THB (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
0.000(0.00%)
Mkt cap ! $8.695M
Open High Low Value Volume
2.7¢ 2.7¢ 2.6¢ $11.72K 438.0K

Buyers (Bids)

No. Vol. Price($)
1 23530 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 499980 1
View Market Depth
Last trade - 15.52pm 16/08/2024 (20 minute delay) ?
THB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.