HRZ 4.00% 4.8¢ horizon minerals limited

Ann: Horizon Outlines Pathway to Gold Production & Project Pipe., page-2

  1. 10,952 Posts.
    lightbulb Created with Sketch. 4530
    Very interesting update! Have management been reading these threads lately? Or someone informed them? Because everything in this reflects our concerns and it actually gives quite a well summarised and detailed timeline to production.
    First thing to note is that first Cannon ore production is now scheduled for Q4 2024 because many of us were upset even hearing 2025 after all the delays to date.
    Second thing that stuck out was the FMR toll milling is yet to be finalised so hopefully there is a firm date for that to start soon. It will give us some much needed cash to fund some of this mine construction for Cannon and Boorara.
    I just had a quick read but there’s definitely other important information in there too. Let’s see if they stick to their words this time..?
    Last edited by coto: 28/03/24
 
watchlist Created with Sketch. Add HRZ (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.002(4.00%)
Mkt cap ! $33.64M
Open High Low Value Volume
4.9¢ 4.9¢ 4.8¢ $19.21K 395.9K

Buyers (Bids)

No. Vol. Price($)
3 196000 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 28219 1
View Market Depth
Last trade - 16.10pm 30/05/2024 (20 minute delay) ?
Last
4.9¢
  Change
-0.002 ( 0.00 %)
Open High Low Volume
4.9¢ 4.9¢ 4.9¢ 29997
Last updated 15.08pm 30/05/2024 ?
HRZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.