A given well production decreases over time. So, a given company needs to drill new wells just to keep the production the same. Not sure whether MC5A and HS4 are connected yet but even if they are connected a production rate of 15TJ would not be achieved IMO.
A newly fracted shale/tight sand well first goes up in production but once the peak rate is achieved the production rate decreases rapidly. No update on MC5A, so I assume the max production was 4.4mmcd (which is very good). The flow rate will be much less once the well is connected.
- Forums
- ASX - By Stock
- AJQ
- Ann: Horseshoe 4 Well Update - Initial Test Flow Result
Ann: Horseshoe 4 Well Update - Initial Test Flow Result, page-26
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AJQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AJQ (ASX) Chart |
Day chart unavailable
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online