CCM 4.00% 5.2¢ cadoux limited

Can people stop engaging with the troll that we have to have the...

  1. 652 Posts.
    lightbulb Created with Sketch. 58
    Can people stop engaging with the troll that we have to have the pilot plant running 24/7 every month - think about WHO is saying that and why.

    WE ARE NOT that incompetent that we need to run our plants all the time for a pitiful amount of HPA. THATS all a4n.



    Stop engaging with it. We have made close to 1 tonne already and sent it all off. Our peers would be lucky to have made 100 kilos. Its actually in their ann - took them months to make 100kg. MONTHS !!!

    FYI make 1kg per hour. or 153KGs per week, and we ran it like 5 times until the JV talks. MORE THAN ENOUGH !!!

    We dont need to be running this thing all the time.. 5 runs was more than enough to enter in JV talks and have a long long list of potential OTs from it.


    Ignore the fud

    ffs
    Last edited by DrCeremic: 09/09/21
 
watchlist Created with Sketch. Add CCM (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
0.002(4.00%)
Mkt cap ! $19.28M
Open High Low Value Volume
5.2¢ 5.2¢ 5.2¢ $53 1.02K

Buyers (Bids)

No. Vol. Price($)
1 98980 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 16119 2
View Market Depth
Last trade - 15.24pm 01/07/2024 (20 minute delay) ?
CCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.