King River Resources Limited (ASX:KRR) provides this update on the Kwinana HPA Prefeasibility Study
(PFS).
Engineering Studies
Como Engineers have completed PFS level engineering studies to provide detailed capital and operating
cost estimates. They are currently finalising the Engineering Report and the layout graphics for inclusion
in the PFS report.
Financial Modelling
FTI Consulting is completing the economic financial model for inclusion in the PFS report.
Alpha Alumina Crystal Structure Analysis
A phase analysis on HPA Batch 4 was completed by MicroAnalysis Australia using X-Ray Diffraction
(XRD) methods which confirmed all the alumina is the Alpha (corundum) crystal form.
Kwinana Industrial Site
KRR has continued investigations with government agencies and private owners for an appropriate
industrial site in the Kwinana area located 30-40 km south of Perth in Western Australia. The Kwinana
Industrial Area is an ideal location as it has feedstock and reagent suppliers, infrastructure, port, energy
supply, and a skilled workforce.
Mini-Pilot Plant
Source Certain International (SCI) is assisting KRR to build a Mini-Pilot Plant to demonstrate KRR’s ARC
HPA refining process at a larger scale for the Definitive Feasibility Study (DFS) and to produce market
samples. The process flowsheet and mass balances have been used to scale the mini-pilot plant and
enquiries with vessel vendors are underway. The 1500°C rotary tube furnace, used for the calcination
stage of the process, has been delivered and is currently being installed.
Other Metallurgical Developments
Metallurgical HPA testwork will be ongoing to further optimise the ARC HPA process for the DFS with the
current focus on further improving the Precursor product to simplify the final calcination stage.
Testwork is also ongoing into extracting high purity vanadium and titanium products from the Speewah
vanadium deposit suitable as intermediate products for battery and master alloy applications.
- Forums
- ASX - By Stock
- Ann: HPA Prefeasibility Study Update
King River Resources Limited (ASX:KRR) provides this update on...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.86M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.3¢ | $322 | 23.01K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 306893 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 2521752 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 306893 | 0.013 |
5 | 748715 | 0.012 |
3 | 579818 | 0.011 |
7 | 2144792 | 0.010 |
12 | 5013467 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 2521752 | 12 |
0.015 | 2688617 | 7 |
0.016 | 4041848 | 7 |
0.017 | 176470 | 1 |
0.018 | 3099974 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
KRR (ASX) Chart |