KRR 10.0% 1.1¢ king river resources limited

Ann: HPA Purity Verification, page-49

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 42 Posts.
    lightbulb Created with Sketch. 94

    27-01-2021 Announcement

    The completion of the metallurgical test work and engineering studies to finalise the PFS based on a Kwinana operation is now expected in Q1 2021 (Jan to Mar 2021)

    25-03-2021 Announcement

    ENGINEERING STUDIES

    Como Engineers’ Capex and Opex estimates are pending some final Vendor costings. Oncompletion, the PFS documentation will be finalised for release to the market

    22-04-2021 Announcement

    ENGINEERING STUDIES

    Como Engineers’ Capex and Opex estimates are being finalised for incorporation into thePFS documentation.

    30-04-2021 Announcement

    ENGINEERING STUDIES

    Como Engineers’ Capex and Opex estimates are pending some final modifications of theHPA washing circuit. On completion, the PFS documentation will be finalised forrelease to the market.

    21-05-2021 Announcement

    ENGINEERING STUDIES

    Como Engineers have completed PFS level engineering studies to provide detailed capital and operating cost estimates. They are currently finalising the Engineering Report and the layout graphics for inclusion in the PFS report.

    FINANCIAL MODELLING

    FTI Consulting is completing the economic financial model for inclusion in the PFS report.

    Como have completed studies but now they need to add layout graphics, something that wasn’t mentioned in any of the previous announcements. Also now FTI come into the equation, once again nothing mentioned about them before.

    Come on KRR, Tony this has dragged out way too long now. The SP is showing people are fed up with the dates given from Q1 2021, to imminent etc. What is going to be the next thing to hold up the release of this PFS. Maybe drag it out to the new financial year or just before AGM??

 
watchlist Created with Sketch. Add KRR (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $15.28M
Open High Low Value Volume
1.0¢ 1.1¢ 1.0¢ $4.615K 460.9K

Buyers (Bids)

No. Vol. Price($)
3 1751415 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 679699 3
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
KRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.