E25 2.17% 22.5¢ element 25 limited

Ann: HPMSM Feasibility Study Delivers Outstanding Economics, page-10

  1. 2,717 Posts.
    lightbulb Created with Sketch. 5854
    I think all the page 5 financial summary numbers relate to the 130kt production variant. The $1,188/t figure referenced is the 130kt average cost and the at full production is used twice, but then again on the next page to reference 130ktpa.

    I think the Maths at that stage when at full 130kt production may be approx:
    • $2,550 * 130kt = $331.5m of revenue.
    • $154.42m of production costs (130kt @ $1,188)
    • $178m of EBITDA (using $2,550/t gets within $1m to the published figure)
    • Throwing these numbers, some capex and lower production in the first few years gets values close to the NPV quoted.

    The original scoping study at 50kt was $1,950*50+$900*16.6=$112.4 less $38.2m costs and $1.3m of unknown rounding for $73m cashflow. Costs and Capex have gone up significantly but they are now likely to be a lot more accurate for an operation operating in the US.

    Also, while the OEM's will obviously try to push down every input cost, $2.55/kg IRA HPMSM HPMSM isn't going to create the same concerns for them as $50-$80/kg Lithium Hydroxide or $35/t cobalt. Synthetic graphite is also in the $8/kg range so manganese would remain a cheaper battery input material.
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
-0.005(2.17%)
Mkt cap ! $48.94M
Open High Low Value Volume
22.0¢ 22.5¢ 21.0¢ $83.54K 388.6K

Buyers (Bids)

No. Vol. Price($)
2 27179 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 194852 2
View Market Depth
Last trade - 16.10pm 25/06/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.