A couple of questions:
1. Is the 8 1/2" hole of MK-2 (so not the side-track) going to be lined or has it been abandoned?
2. The pressure apparently significantly rises from 3400 mMD and below in MK-2. How certain is it that the pressure at the same depth when drilling the side-track will be the same as at the same depth when MK-2 was drilled? i.e. How predictive is the pressure readings from MK-2 in relation to the side-track?
As a comment, my observation is that the company thinks that the Lower Angwa could be huge. It explains why the company have consistently risked samples from the Upper Angwa in order to drill into the Lower Angwa. They are still risking UA samples by:
(a) Drilling the side-track to ~3,400 mMD; and
(b) Drilling the side-track all at once rather than drilling part, then sampling, then drilling the rest.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-1041
-
-
- There are more pages in this discussion • 624 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
8.7¢ |
Change
-0.001(1.14%) |
Mkt cap ! $123.3M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.4¢ | $496.7K | 5.718M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 8.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 400000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 0.087 |
1 | 100000 | 0.086 |
1 | 14457 | 0.085 |
8 | 364119 | 0.084 |
4 | 383830 | 0.083 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 400000 | 1 |
0.090 | 250000 | 1 |
0.091 | 315000 | 2 |
0.092 | 325000 | 2 |
0.093 | 360000 | 5 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online