IVZ 0.00% 7.0¢ invictus energy ltd

Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-330

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "So I guess slb get a bit of a pass as the damage to the probe was caused by the borehole which was caused by having to increase the mud weight."

    Damage to Saturn probe and other tool components mainly during trip in the hole on drill pipe. As SM mentioned unlike on wireline where the tool has a certain amount of flex on drill pipe the tool is more rigid and there is a higher risk of damage when you run into hole bridges and wash outs. The 12 degree hole angle wouldnt have helped with the tool tending to run low side in the hole. A vertical hole will reduce risk of hang ups...especially if they meed to to go TLC again.

    SM also mentioned a world wide shortage of MDT tools.

    Mud weight will be high enough to maintain well control in the section above the overpressured Lower Angwa section.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
7.0¢
Change
0.000(0.00%)
Mkt cap ! $99.25M
Open High Low Value Volume
7.0¢ 7.0¢ 7.0¢ $2.649K 37.84K

Buyers (Bids)

No. Vol. Price($)
1 100000 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 392632 4
View Market Depth
Last trade - 10.04am 16/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.