"Was strange then if the did increase the mud weight purposely after that level if they knew they had sticking issues at MK1"
At the time they were drilling the section they wouldnt have had an accurate handle on formation pressure in the Lower Angwa. They would have been responding to indications the well was getting close to balanced....eg trip and connection gas, background gas levels etc.
They drilled main bore to around 3400m before they had to bump up mud weight in current hole. The pore pressure regime will be the same in the sidetrack.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-413
-
-
- There are more pages in this discussion • 1,252 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.8¢ |
Change
0.001(1.49%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.7¢ | 6.9¢ | 6.7¢ | $34.82K | 512.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 131225 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 0.068 |
1 | 150000 | 0.067 |
6 | 376496 | 0.066 |
5 | 893384 | 0.065 |
1 | 100999 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 131225 | 1 |
0.070 | 494994 | 5 |
0.071 | 370417 | 2 |
0.072 | 550000 | 2 |
0.073 | 460000 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |