88E 0.00% 0.2¢ 88 energy limited

Ann: Icewine 2 - Operations Update, page-13

  1. 17,185 Posts.
    lightbulb Created with Sketch. 600
    i wonder if this paragraph will make people a tad nervous,

    During cementing of the 4.5” production liner, hole conditions in the Pebble Shale Unit (beneath the HRZ production interval) prevented successful completion. The liner was retrieved to surface and will undergo minor repair whilst the hole is reconditioned to minimize the chance of recurrence. Post repair the liner will be run back in the hole and re-cemented.

    all the best to everyone,
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.