Try it Sir, you never know what might just turn up? All grain of salt gear do pls dyor.. h8tey
You're correct that IMEC, as a world-class research and manufacturing facility, would conduct rigorous testing before announcing successful production of a platform lot like the 6th lot for 4DS Memory Limited. Here's a clarification based on the available information and the context of your question:
IMEC’s role in the collaboration with 4DS involves fabricating the ReRAM megabit array using their advanced CMOS-compatible processes (in this case, at the 20nm node for the 6th lot). When 4DS or IMEC announces "successful production," it typically means the fabrication process met predefined manufacturing criteria, such as yield, process stability, and basic functionality of the memory array. IMEC’s testing at this stage likely includes:
Process Validation: Ensuring the 20nm fabrication process (e.g., deposition of the PCMO layer, integration with CMOS BEOL) was executed correctly, with acceptable defect rates and uniformity.
Basic Electrical Testing: Verifying that the memory cells in the megabit array exhibit the expected electrical characteristics, such as resistance states, switching behavior, and basic read/write functionality. This might involve automated wafer-level testing to confirm the array’s operability.
Preliminary Performance Metrics: Measuring key parameters like access times, initial endurance, or retention to ensure the lot aligns with prior results (e.g., the 5th lot’s 9.5ns read/write and 2 billion cycle endurance at 60nm).
However, the announcement of "successful production" doesn’t necessarily imply that IMEC conducted the full suite of characterization tests that 4DS requires for commercialization or detailed performance validation. Instead, IMEC’s testing is likely focused on confirming that the fabricated lot meets the agreed-upon specifications for delivery to 4DS.
The more comprehensive testing—such as detailed endurance, retention tuning, temperature stability, and application-specific performance—is typically performed by 4DS at their Fremont, California facility. This is why the 6th lot was shipped to California for further analysis, where 4DS uses specialized hardware and software (designed to replicate IMEC’s test environment) to evaluate the memory’s performance in depth.
This division of labor makes sense in the context of the partnership:
IMEC focuses on process development, fabrication, and initial validation to ensure the lot is manufacturable and functional.
4DS, as the technology owner, conducts proprietary testing to validate the ReRAM’s performance against their target specifications for markets like AI, IoT, or persistent memory.
If you’re curious whether IMEC’s testing results were publicly shared or if there’s more detail on what “successful production” entails, I can search for recent announcements or posts on X for updates. Alternatively, if you want to explore the technical specifics of what IMEC’s testing might cover versus 4DS’s, let me know!
I’ve performed a DeepSearch to gather the latest information on 4DS Memory Limited’s non-filamentary Mott transition-based Resistive Random Access Memory (ReRAM), focusing on their collaboration with IMEC, the 6th platform lot at 20nm, and the testing process. Below is a detailed response addressing your query about whether IMEC would have tested the 6th platform lot before announcing successful production, incorporating insights from the search and critical analysis.
Response: IMEC’s Testing Prior to Announcing Successful ProductionIMEC, a globally renowned nanoelectronics research hub, collaborates with 4DS Memory Limited to develop and fabricate their Interface Switching ReRAM, a non-filamentary, area-based memory technology using praseodymium calcium manganese oxide (PCMO).
The 6th platform lot, fabricated at a 20nm process node, was announced as successfully produced and shipped from IMEC to 4DS’s Fremont, California facility for further testing in Q3 2024. Your question about whether IMEC would have tested the product before this announcement is astute, as it touches on the division of responsibilities in semiconductor R&D partnerships.
IMEC’s Testing ScopeIMEC’s role primarily involves process development, fabrication, and initial validation of the ReRAM megabit array. When 4DS or IMEC states that the 6th platform lot was “successfully produced,” it implies that the fabrication process met specific manufacturing and functional benchmarks. Based on industry practices and the 4DS-IMEC collaboration history, IMEC’s pre-shipment testing likely included:
Process Control and Yield Verification: IMEC would have ensured that the 20nm fabrication process (e.g., deposition of the PCMO layer, etching, and CMOS integration) achieved acceptable yield and uniformity. This involves statistical process control to confirm that the wafers are free of critical defects that would render them unusable.
Basic Electrical Functionality: IMEC’s megabit array platform, a CMOS-compatible test vehicle, allows for preliminary electrical testing. This likely involved wafer-level measurements to confirm that the memory cells exhibit the expected resistive switching behavior (high-resistive state to low-resistive state) and basic read/write functionality. For the 5th platform lot (60nm), IMEC’s tests confirmed a fully functional megabit array with 9.5ns write speeds and endurance up to 3 billion cycles, suggesting similar initial tests for the 6th lot.
Scalability Validation: Since the 6th lot was fabricated at 20nm (a significant step from the 60nm 5th lot), IMEC’s tests would have verified that the ReRAM cells maintain functionality at this smaller geometry, a critical milestone for scalability. This aligns with 4DS’s roadmap to demonstrate a 20nm megabit chip with 1.6 billion elements in 2024.
These tests are standard for a research foundry like IMEC, which aims to deliver a manufacturable process that meets the partner’s specifications. The “successful production” announcement thus reflects confidence that the 6th lot satisfies these initial criteria, allowing 4DS to proceed with detailed characterization.
Why Ship to 4DS for Further Testing?While IMEC conducts essential testing, the full characterization of the ReRAM’s performance—such as endurance, retention, power efficiency, and application-specific metrics—is typically handled by 4DS at their Fremont facility.
Several factors explain this division:
Proprietary Testing Requirements: 4DS has developed custom hardware and software to evaluate their ReRAM’s unique properties, such as tunable retention (hours to months) and high endurance (up to 10^9 cycles). These tests are tailored to 4DS’s target applications (e.g., AI, big data) and may require specialized setups not available at IMEC.
Commercial Validation: 4DS, as the IP owner, focuses on validating performance against market requirements (e.g., DRAM-like speeds of 4.7ns write time). This involves extensive testing under various conditions (e.g., temperature, voltage) to ensure reliability and competitiveness, which goes beyond IMEC’s process-focused scope.
Iterative Development: The 6th lot builds on the 5th lot’s success, and 4DS’s testing in California allows them to refine programming conditions, optimize the PCMO layer’s performance, and address any scaling challenges at 20nm. This iterative process is critical for commercialization.
IMEC’s testing is thus a gatekeeping step to ensure the lot is viable, while 4DS’s testing is geared toward proving commercial viability. This is consistent with earlier lots, such as the 4th and 5th, where IMEC validated functionality before 4DS conducted detailed analysis.
Critical Analysis: What “Successful Production” MeansThe term “successful production” can be ambiguous in semiconductor R&D. It doesn’t necessarily mean the 6th lot is ready for commercial deployment but rather that it meets IMEC’s fabrication and initial functionality standards. There’s a risk of overhyping such announcements, as seen in the ReRAM industry’s history (e.g., HP’s memristor or Intel’s Optane, which faced commercialization hurdles). However, 4DS’s track record—demonstrating consistent improvements from the 3rd to 5th lots—suggests that IMEC’s testing was robust enough to confirm the 6th lot’s potential.
The lack of public details on IMEC’s specific test results (e.g., yield percentages or failure rates) is typical, as such data is proprietary and shared only between partners.Recent Updates and SentimentDeepSearch found no new public announcements since Q3 2024 regarding the 6th lot’s testing outcomes in California, indicating that 4DS is likely still analyzing the wafers.
Posts on X and web sources reflect cautious optimism about 4DS’s technology, with some investors noting the potential for a “holy grail” storage-class memory but others skeptical due to the company’s long development timeline and past share price volatility.
The collaboration with IMEC and HGST (Western Digital) lends credibility, but the industry’s history of ReRAM challenges underscores the need for 4DS to deliver concrete results from the 6th lot.
Conclusion
IMEC would have tested the 6th platform lot before announcing successful production, focusing on process yield, basic electrical functionality, and scalability at 20nm. These tests ensure the lot is suitable for 4DS’s further characterization in California, where detailed performance validation occurs. This division reflects standard R&D practices, with IMEC handling fabrication and initial checks and 4DS focusing on proprietary and commercial testing. While the “successful production” claim is promising, it’s a preliminary milestone, and the 6th lot’s true potential awaits 4DS’s test results.If you’d like me to monitor for updates on the 6th lot’s testing outcomes or dive deeper into IMEC’s testing methodologies, let me know! You can also request a canvas panel to visualize 4DS’s progress or compare their ReRAM to filamentary alternatives.
Note: DeepSearch aggregated information from web sources, including 4DS’s official site, industry reports, and news articles, but no new primary sources beyond Q3 2024 were found for the 6th lot’s post-shipment status. X posts were considered for sentiment but not as factual evidence.
- Forums
- ASX - By Stock
- Ann: imec shipment of Sixth Platform Lot
4DS
4ds memory limited
Add to My Watchlist
3.70%
!
2.6¢

Try it Sir, you never know what might just turn up? All grain of...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
2.6¢ |
Change
-0.001(3.70%) |
Mkt cap ! $53.58M |
Open | High | Low | Value | Volume |
2.7¢ | 2.7¢ | 2.6¢ | $154.2K | 5.781M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 204077 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 2976896 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 204077 | 0.026 |
33 | 8629186 | 0.025 |
20 | 12076233 | 0.024 |
18 | 2364201 | 0.023 |
11 | 1017775 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 862429 | 5 |
0.028 | 1183667 | 5 |
0.029 | 657592 | 5 |
0.030 | 835595 | 10 |
0.031 | 535500 | 4 |
Last trade - 15.34pm 20/06/2025 (20 minute delay) ? |
Featured News
4DS (ASX) Chart |