We need a few more of these holes, starting to take shape
MDD025R (redrill of MDD025) o 14.0 metres @ 9.00 g/t Au from 264.0 metres including: ▪ 3 metres @ 31.4 g/t Au from 265 metres, and ▪ 1 metre @ 13.5 g/t Au from 271 metres, with ▪ Assay results pending for remainder of the drillhole (80.7 metres) • MDD025 (abandoned due to technical issues, with intercept 10 metres east of MDD025R) o 4.5 metres @ 9.03 g/t Au from 261.2 metres to end of hole (EOH), including ▪ 1 metre @ 23.80 g/t Au from 262.0 metres
- Forums
- ASX - By Stock
- SMI
- Ann: Impressive Drill Assays and Metallurgical Testwork Results
Ann: Impressive Drill Assays and Metallurgical Testwork Results, page-2
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.26 |
Change
0.080(3.67%) |
Mkt cap ! $476.6M |
Open | High | Low | Value | Volume |
$2.19 | $2.27 | $2.19 | $380.9K | 171.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9528 | $2.25 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.27 | 19869 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9528 | 2.250 |
1 | 9930 | 2.240 |
2 | 7236 | 2.230 |
1 | 2236 | 2.220 |
1 | 2236 | 2.210 |
Price($) | Vol. | No. |
---|---|---|
2.270 | 19869 | 1 |
2.290 | 20158 | 2 |
2.300 | 17000 | 3 |
2.310 | 20000 | 1 |
2.330 | 25000 | 2 |
Last trade - 16.10pm 10/10/2024 (20 minute delay) ? |
Featured News
SMI (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online