and yet still no economic parameters provided...reminds me of the great Maverick Drilling (MAD.ASX) and their 'independent reserves engineer' Richard Pomrenke (some bloke that lived in a modest home in the outer suburbs of Houston according to the address of Pomrenke Enterprises) that booked 200mmbbls of 2P Reserves. Also with no economic parameters.
Whether these numbers are real or not, my real question is why is the Company at such great pains to keep restating the same information and yet not provide the details that would serve to engender some market belief in their validity?
- Forums
- ASX - By Stock
- Ann: In-Depth Review of the Leigh Creek Energy Project PRMS
and yet still no economic parameters provided...reminds me of...
-
- There are more pages in this discussion • 116 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online