Hey you guys forgot about me.
So here's my little game to play - let's call it thec o l o u r game.
See how you go.
As you know on Thursday the 11th April 2019, Leigh Creek Energy notified DEM-ERD that it planned to commence the decommissioning process of its gasifier in accord with its approved PCD decommissioning plan. At 6 pm on Thursday the 11th April 2019 Leigh Creek Energy commenced this decommissioning operation. At this point in time, based on the information at hand, as per my statement in my 6th February approval letter, included here for convenience, my position remains unchanged.
- The PCD has yet to sustain full flow rate gasification and production of syngas as defined in the relevant Environmental Impact Report (EIR) for the in-situ gasification (ISG) demonstration plant; and
- Only afterfull, stabilised flow rate gasification is achieved will Leigh Creek Energy be able to commenceoperation of its pre-commercial demonstration(PCD) trial to evaluate the technical and environmental feasibility of ISG within theTelford Basin.
I suggest you contact LCK directly for any further information they may be willing to share publicly.
Kind regards
Michael Malavazos (FIChemE) Director Engineering Operations Energy Resources Division
Department for Energy and Mining
M: 0401 121 666 T + 61 (8) 842 92470
- Forums
- ASX - By Stock
- Ann: In-Depth Review of the Leigh Creek Energy Project PRMS
Hey you guys forgot about me.So here's my little game to play -...
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online