PM8 0.00% $1.66 pensana plc

Ann: In fill drilling programme commences, page-4

  1. 1,836 Posts.
    lightbulb Created with Sketch. 306
    ASX Release 19 November 2019 First containers leave site and in‐fill drilling programme commences Pensana Metals Ltd (ASX: PM8) is pleased to provide an update on activities on site at the Longonjo NdPr Project in Angola. Four containers carrying over 60 tonnes of near surface weathered mineralisation have been loaded at the Longonjo rail siding for despatch to Perth Australia via the Benguela rail line and the Port of Lobito. Figure 1: Loading samples onto container Figure 2: Country Manager, Paulo Nunes supervising despatch of the bulk sample at Longonjo Station on the Benguela Railway line Pilot plant testwork on this bulk sample will enable the detailed process route design to be finalised and batches of NdPr rich concentrate produced to be sent to selected potential customers in China.

    How long will Pilot Plant testwork take?
 
watchlist Created with Sketch. Add PM8 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.