KSN 3.80% 7.6¢ kingston resources limited

Ann: Increase in Contained Gold and Silver at Pearse North, page-2

  1. 25,558 Posts.
    lightbulb Created with Sketch. 1203
    Increase in Contained Gold and Silver at Pearse North
    Updated open pit mineral resource estimate at Mineral Hill
    Highlights
    • MRE for Pearse North increased for gold and silver by 30% and 67% respectively to 292kt @
    3.2 g/t Au and 34 g/t Ag for 30 koz of gold and 318 koz of silver.
    • Greater confidence in the deposit’s continuity: Review of the orientation of mineralisation shows
    greater spatial continuity than previously modelled.
    • Optimising the mine plan for current gold prices: The planned pit design is being re-optimised to
    take advantage of current gold prices.
    Kingston Resources Limited (ASX:KSN) (“Kingston’, or ‘The Company’ is pleased to announce an updated
    JORC 2012 Mineral Resource Estimate (MRE) for the Pearse North of 292kt @ 3.2 g/t Au and 34 g/t Ag for
    30,000 oz of gold and 318,000 oz of silver. This update is supported by additional drilling data that was
    acquired in 2023 and the refinement of the geological interpretation.
    In comparison to the 2022 MRE for Pearse North, contained gold and silver has increased 30% and 67%
    respectively. This update presents a significant opportunity to take advantage of recent momentum in the
    gold price. Mining at Pearse North is scheduled to commence in the current quarter.
    An update of the pit optimisation and mine design with this MRE is currently underway. Gold and silver
    production from the Pearse pits is expected to have a material impact on Kingston’s balance sheet. Further
    updates will be provided when the updated mining schedule is finalised. The refurbishment of the processing
    plant is progressing on time and budget in readiness for treatment of the gold ore from the Pearse deposits.
    Table 1: Pearse North Mineral Resource Estimate at 1.0g/t Au Cut Off
    Classification Tonnes kt Grade Au g/t Grade Ag g/t Metal Au koz Metal Ag koz
    Indicated 270 3.2 34.2 28 297
    Inferred 22 2.9 29.1 2 21
    Total 292 3.2 33.9 30 318
    * Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
    Kingston Resources Managing Director, Andrew Corbett, comments:
    “We are excited about the transition from tailings mining to open pit mining at our Pearse North Project. This
    shift will allow us to significantly expand our gold production over the coming year, while also increasing
    operating cash flow. The high-grade nature of the pits and the momentum in the gold price provide a strong
    backdrop for maximising margins from this highly lucrative resource.
    The entire technical team has done a fantastic job ensuring the Project has access to high-quality Mineral
    Resources and Ore Reserves necessary to support a successful Mine Plan.”
 
watchlist Created with Sketch. Add KSN (ASX) to my watchlist
(20min delay)
Last
7.6¢
Change
-0.003(3.80%)
Mkt cap ! $53.73M
Open High Low Value Volume
7.8¢ 7.8¢ 7.5¢ $68.59K 902.3K

Buyers (Bids)

No. Vol. Price($)
1 29000 7.6¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 47941 2
View Market Depth
Last trade - 15.33pm 14/06/2024 (20 minute delay) ?
Last
7.6¢
  Change
-0.003 ( 4.04 %)
Open High Low Volume
7.9¢ 7.9¢ 7.5¢ 109730
Last updated 15.33pm 14/06/2024 ?
KSN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.