Sorry, another post.
If the new assumption is right.
The BFS is based on LGS 900,000 mtu and Hard rock of 1m mtu (1.26mt @0.8%) = 1.9mtu gives a NPV of $131m
The upgraded resource has 7.6m mtu
Sorry, another post.If the new assumption is right. The BFS is...
Add to My Watchlist
What is My Watchlist?