That is but your opinion Soundwave 104
Did you watch DD at the BMO conference? What questions was he asked at the end? It was all about the pilot and whether a larger pilot would be built or is required.
The pilot allegedly has a capacity of 40tpa, and we've been told that it is operating at 90% capacity, yet it will take them 6-7 months to produce the 120,000L that shareholders were told would take 3-4 months......so double the time.
We've been told that the pilot hit 80% recovery. That does not include 85% of the flowsheet.....yet the entire PFS assumes a recovery of 83%.
The Kachi resource went from 285mg/L to 211mg/L.
Prior samples were greater than 99.95% purity, the saltworks sample was 99.8%, with no Assay provided, no recovery rate, no volume.
You keep pumping this hard soundwave. It needs all the help it can get.
ps, fingers crossed it holds 47c before close
- Forums
- ASX - By Stock
- LKE
- Ann: Independent Verification of High-Grade Lithium Carbonate
Ann: Independent Verification of High-Grade Lithium Carbonate, page-122
-
- There are more pages in this discussion • 118 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.0¢ |
Change
-0.001(1.64%) |
Mkt cap ! $104.2M |
Open | High | Low | Value | Volume |
6.1¢ | 6.2¢ | 5.7¢ | $463.0K | 7.772M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 68474 | 5.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.0¢ | 313567 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 68474 | 0.059 |
3 | 2589680 | 0.058 |
3 | 300000 | 0.057 |
12 | 227312 | 0.056 |
12 | 722907 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.060 | 35784 | 2 |
0.061 | 163934 | 1 |
0.062 | 288792 | 5 |
0.063 | 368373 | 2 |
0.064 | 546877 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |