Just re-reading some of the announcements, and was hoping to hear opinions from those with more expertise/experience regarding the below bolded comment.
"The processing facility will be a traditional carbon-in-leach gold plant which isideally suited to Black Cat’s Resources as well as to third party free milling ores located around Kalgoorlie."
I note that $BC8 is deliberately choosing to install the lower capacity equipment, specifically Outokumpu ball mills (which makes sense for their resources), but with surrounding resources growing ($MOH, $HRN?) - is there $$ to be made here or are the margins small? why wouldn't they do the full installation?
- Forums
- ASX - By Stock
- BC8
- Ann: Infill and Grade Control Results Impress
Ann: Infill and Grade Control Results Impress, page-26
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BC8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
26.0¢ |
Change
-0.005(1.89%) |
Mkt cap ! $80.22M |
Open | High | Low | Value | Volume |
26.5¢ | 27.0¢ | 25.0¢ | $840.1K | 3.226M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 318192 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.5¢ | 191141 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 318192 | 0.255 |
17 | 463551 | 0.250 |
4 | 82747 | 0.245 |
4 | 609166 | 0.240 |
2 | 104000 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.265 | 191141 | 3 |
0.270 | 189615 | 2 |
0.275 | 100000 | 1 |
0.285 | 30000 | 1 |
0.290 | 72007 | 3 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
26.5¢ |
  |
Change
-0.005 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
26.0¢ | 26.5¢ | 25.5¢ | 1394824 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
BC8 (ASX) Chart |