A 42-hole RC drilling programme representing 4,967m has recently been
completed over the Warrawoona Gold Project in WA
• 35 RC drill holes for 4,053m were completed over the current Klondyke Resource
as part of an infill programme;
• 7 RC drill holes for 914m were drilled into two regional targets that a truckmounted air-core rig was unable to access;
• An initial batch of results have been received for 10 holes drilled into the western
part of the Klondyke Resource, with results including:
• 13m @ 1.58g/t Au from 28m
• 12m @ 1.52g/t Au from 66m
• 5m @ 2.85g/t Au from 2m
• 7m @ 1.90g/t Au from 86m
• 6m @ 2.06g/t Au from 71m
• The infill drilling across the Klondyke deposit was undertaken to increase the
reliability of the Resource and the mineralisation types inside the PFS open cut pit
design as part of an ongoing strategy to de-risk the project;
• Results have confirmed the grade continuity of the western portion of the current
Klondyke Resource model. Results for the eastern portion are pending and will be
released in due course;
• A shallow costeaning programme of 8 costeans has also recently been completed
across the Klondyke Resource area for confirmatory testing of the grade
continuity and mineralisation types of outcropping mineralisation at surface.
Assays are pending and will be released in due course;
- Forums
- ASX - By Stock
- CAI
- Ann: Infill Drilling Results Increase Confidence in Resource
Ann: Infill Drilling Results Increase Confidence in Resource, page-2
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online