Oxxa i had the same thoughts around the testwork part. it all depends on the consistency of the % of high grade and the % of the low grade to get 63% in the end. i fear this could be quite a time consuming to get the "blend" right to ensure material is not wasted.
Or i am completely wrong and the blend process is straight forward.....
Well they want to pay in 1000 tonne lots, so given that i assume they pick up small lots at a time. but who knows until that first cheque is banked......argh so boring watching this low volume go through lol
- Forums
- ASX - By Stock
- Ann: Infinity Ores - 20,000 Tonne PO Update
Oxxa i had the same thoughts around the testwork part. it all...
-
- There are more pages in this discussion • 180 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable