geodrill, I've visited Mtwara Port and toured it with port management. The port can easily handle GPX production as it is: 69,000 tpa = 189 tonnes per day = 8 x 20' containers per day = 4 semi trailers.
The current Berth 1 at Mtwara can berth 2 x 1,700 capacity container ships at once, and the construction of Berth 2, the same size as 1, commenced in March.
And there's plenty of level land around the port to stockpile material / containers (and/or downstream processing?) until there's enough for a shipment.
- Forums
- ASX - By Stock
- MVL
- Ann: Infrastructure advances enhance development of Chilalo
Ann: Infrastructure advances enhance development of Chilalo, page-6
Featured News
Add MVL (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
0.001(12.5%) |
Mkt cap ! $7.774M |
Open | High | Low | Value | Volume |
0.7¢ | 0.9¢ | 0.7¢ | $240 | 27.52K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1666438 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 675526 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1666438 | 0.007 |
2 | 1250000 | 0.006 |
3 | 2200000 | 0.005 |
1 | 400000 | 0.004 |
3 | 2850000 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 675526 | 3 |
0.009 | 1185035 | 2 |
0.010 | 1303555 | 7 |
0.011 | 76765 | 1 |
0.012 | 1015500 | 3 |
Last trade - 10.11am 04/07/2024 (20 minute delay) ? |
Featured News
MVL (ASX) Chart |