geodrill, I've visited Mtwara Port and toured it with port management. The port can easily handle GPX production as it is: 69,000 tpa = 189 tonnes per day = 8 x 20' containers per day = 4 semi trailers.
The current Berth 1 at Mtwara can berth 2 x 1,700 capacity container ships at once, and the construction of Berth 2, the same size as 1, commenced in March.
And there's plenty of level land around the port to stockpile material / containers (and/or downstream processing?) until there's enough for a shipment.
- Forums
- ASX - By Stock
- Ann: Infrastructure advances enhance development of Chilalo
geodrill, I've visited Mtwara Port and toured it with port...
Featured News
Add MVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.910M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 482642 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 974162 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 482642 | 0.008 |
1 | 700000 | 0.007 |
4 | 1580073 | 0.006 |
1 | 300000 | 0.005 |
1 | 400000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 974162 | 4 |
0.011 | 979721 | 2 |
0.012 | 1527067 | 4 |
0.015 | 200000 | 1 |
0.024 | 560400 | 1 |
Last trade - 10.04am 28/08/2024 (20 minute delay) ? |
Featured News
MVL (ASX) Chart |
Day chart unavailable
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
Previous Video
Next Video
SPONSORED BY The Market Online