CKA 0.00% 9.7¢ cokal limited

Krajan has been active loading point for 45m ~800t barges to...

  1. 836 Posts.
    lightbulb Created with Sketch. 290

    Krajan has been active loading point for 45m ~800t barges to Batu Tuhup pile for a long time - occasionally I catch one on water like above; mostly they are docked or not in image. Similarly we catch these small barges unloading at Batu Tuhup periodically as well as the supply barges at Batu Tuhup arriving.
    What we want to see is the 4000t barge at Batu loading - this will be the big step that everyone is waiting for progress wise (although the company could argue that given they have already received advance payment - it is not as sensitive as some here make out - nevertheless it will be a reassuring logistics milestone). Until conveyor operational, the larger 70m 4000t barges will need careful management to be loaded without stranding as river level fluctuates as well as first time navigation of that section of river. We know that another operater already gets to within 10 river km of Batu Tuhup (image below, Batu Tuhup is clear area left, coal pile of another operator right)https://hotcopper.com.au/data/attachments/6043/6043742-7b5f9dc0cb69230cca1fb5f6c6a79ae4.jpg
    so far site is too cloudy today to see new (this is older last clear image)
    Last edited by playdough: 20/03/24
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
9.7¢
Change
0.000(0.00%)
Mkt cap ! $104.6M
Open High Low Value Volume
10.0¢ 10.0¢ 9.6¢ $28.09K 287.7K

Buyers (Bids)

No. Vol. Price($)
1 54183 9.7¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 96126 2
View Market Depth
Last trade - 13.13pm 14/06/2024 (20 minute delay) ?
Last
9.8¢
  Change
0.000 ( 1.03 %)
Open High Low Volume
9.8¢ 9.8¢ 9.8¢ 15500
Last updated 13.26pm 14/06/2024 ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.