Assumptions? lol
Are the missing barges an assumption?
Is the missed completion deadline for conveyor by 31 January an assumption?
Is the missing information on the BBM 44 hole drilling program an assumption?
Is the missing 2023 reserve report an assumption?
Is the failure to explain the downgrade of 330 days of barging to 250 days (on a long term basis) an assumption?
Is the stoppage of increasing stockpiles at Batu Tuhup an assumption?
You are funny mate.
- Forums
- ASX - By Stock
- CKA
- Ann: Infrastructure Development MOU
Ann: Infrastructure Development MOU, page-85
-
- There are more pages in this discussion • 133 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.005(5.00%) |
Mkt cap ! $113.2M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.5¢ | $11.09K | 105.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 60308 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 423849 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 60308 | 0.100 |
2 | 140404 | 0.099 |
1 | 10000 | 0.098 |
1 | 5154 | 0.097 |
1 | 124232 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 423849 | 5 |
0.110 | 822971 | 9 |
0.115 | 554032 | 8 |
0.120 | 458000 | 6 |
0.125 | 300000 | 2 |
Last trade - 16.10pm 14/05/2024 (20 minute delay) ? |
|
|||||
Last
10.0¢ |
  |
Change
0.005 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
10.5¢ | 10.5¢ | 10.0¢ | 100869 | ||
Last updated 15.56pm 14/05/2024 ? |
Featured News
CKA (ASX) Chart |