CKA 4.76% 10.0¢ cokal limited

Ann: Infrastructure Development MOU, page-93

  1. 239 Posts.
    lightbulb Created with Sketch. 105
    These my friend ARE FACTS. NOT ONE THING BELOW IS AN ASSUMPTION.

    ALL FACTS
    100% PURE AUSSIE FACTS produced by Lazy f*er Domenic.

    Are the missing barges an assumption?
    Is the missed completion deadline for conveyor by 31 January an assumption?
    Is the missing information on the BBM 44 hole drilling program an assumption?
    Is the missing 2023 reserve report an assumption?
    Is the failure to explain the downgrade of 330 days of barging to 250 days (on a long term basis) an assumption?
    Is the stoppage of increasing stockpiles at Batu Tuhup an assumption?
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $107.8M
Open High Low Value Volume
10.0¢ 10.5¢ 10.0¢ $89.66K 893.3K

Buyers (Bids)

No. Vol. Price($)
2 55308 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 421683 2
View Market Depth
Last trade - 16.10pm 13/05/2024 (20 minute delay) ?
Last
10.0¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
10.0¢ 10.5¢ 10.0¢ 407533
Last updated 15.36pm 13/05/2024 ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.