The whole idea of building a Railway Line from Wiluna to Leonora has become to daunting for a lot of people, and most are thinking its too hard
It will be easier and cheaper than a lot of people think
For starters it won't be built by GWR on it's own... I'm pretty sure that there will be a lot more other companies to share the costs
There's BHP with its Mt Keith and Leinster operations... 85% of bhp nickel is sold to Battery suppliers... So they will still be going for a while.
and there's the state government who also might be keen.
as for leonora to kalgoorlie that needs a bit of work done on it... Whoever owns the line will be fixing most of it... probably ask users to chip in some.
- Forums
- ASX - By Stock
- GWR
- Ann: Infrastructure for Long Term Production - Desk Top Study
Ann: Infrastructure for Long Term Production - Desk Top Study, page-21
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.0¢ |
Change
0.001(1.27%) |
Mkt cap ! $25.69M |
Open | High | Low | Value | Volume |
8.2¢ | 8.2¢ | 7.9¢ | $82.95K | 1.034M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 54999 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.2¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 54999 | 0.080 |
1 | 35954 | 0.079 |
2 | 200000 | 0.078 |
1 | 83597 | 0.077 |
1 | 300000 | 0.076 |
Price($) | Vol. | No. |
---|---|---|
0.082 | 250000 | 1 |
0.085 | 362194 | 2 |
0.100 | 91375 | 2 |
0.110 | 5500 | 1 |
0.115 | 15384 | 1 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |