Forget Rail to Geralton because that will be building a railway line 700kms... Then you need a deep water Port ... Geralton isn't a deep water port
Oakajee is not built yet and is probably never going to be.. not in the near future anyway.
300km of Rail to Leonora, looks like the easiest and cheapest way to go.
Expansion of Esperance Port for share infrastructure won't be too much of a problem... MIO are already in discussions with them.
- Forums
- ASX - By Stock
- Ann: Infrastructure for Long Term Production - Desk Top Study
Forget Rail to Geralton because that will be building a railway...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.003(3.49%) |
Mkt cap ! $26.66M |
Open | High | Low | Value | Volume |
8.3¢ | 8.3¢ | 8.3¢ | $487 | 5.872K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 26528 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 99999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 26528 | 0.080 |
2 | 92529 | 0.078 |
1 | 30000 | 0.077 |
1 | 7000 | 0.075 |
1 | 14285 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 99999 | 1 |
0.089 | 1800 | 1 |
0.094 | 1250 | 1 |
0.100 | 29000 | 1 |
0.105 | 25001 | 1 |
Last trade - 10.04am 05/07/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |