That's why they upgraded the Leonora to kalgoorlie line in the first place... For Nickel....They upgraded from narrow to standard guage and later Re-railed to a heavier line.
leinester concentrate was carted to leonora by road, then loaded on a train to go to the kalgoorlie smelter and that only stopped because they had trouble with the mine at leinster. I don't know if it has restarted.
Also Windarra nickel was loaded at malcolm siding (25km from Leonora) and sent to the kalgoorlie smelter
So the leonora line has always been about NICKEL.... So far.
- Forums
- ASX - By Stock
- GWR
- Ann: Infrastructure for Long Term Production - Desk Top Study
Ann: Infrastructure for Long Term Production - Desk Top Study, page-26
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.62M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18178 | 8.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.6¢ | 120611 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18178 | 0.084 |
2 | 139548 | 0.083 |
1 | 12195 | 0.082 |
1 | 190000 | 0.081 |
3 | 372500 | 0.080 |
Price($) | Vol. | No. |
---|---|---|
0.086 | 120611 | 2 |
0.087 | 98397 | 1 |
0.088 | 50006 | 1 |
0.090 | 50431 | 1 |
0.092 | 123633 | 2 |
Last trade - 16.12pm 12/11/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, MD & CEO
Charles Armstrong
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online