What a flood of information!!!!!!
So all of these are servicing the upper Barito River Mines and not servicing the local mines. Note no land based delivery system.
So for people that doubt the logistics, all these companies are following the BHP Logistics System (Mine) and really the pioneer MGM that gave us the starting point. in late 2004, I investigated MGM for Xstrata and then joined BHP Maruwai Project. So I knew what worked in a fundamental way.
So the neat one looks like my Teluk Timbau that was designed for BHP and now Adaro's ISP dedicated to HCC from Lampunut Mine in Maruwai CCoW project. I'll dig out drawings and photos I took from helicopter.
- Forums
- ASX - By Stock
- CKA
- Ann: Infrastructure Joint Venture Advances to the Next Stage
Ann: Infrastructure Joint Venture Advances to the Next Stage, page-175
-
-
- There are more pages in this discussion • 568 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
0.004(5.48%) |
Mkt cap ! $83.07M |
Open | High | Low | Value | Volume |
7.3¢ | 7.9¢ | 7.3¢ | $2.048K | 27.95K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 178553 | 7.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 33766 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 178553 | 0.073 |
2 | 161472 | 0.072 |
1 | 250000 | 0.071 |
1 | 25000 | 0.069 |
2 | 42000 | 0.066 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 33766 | 1 |
0.080 | 57500 | 2 |
0.083 | 100000 | 1 |
0.084 | 55000 | 1 |
0.085 | 2083 | 1 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
CKA (ASX) Chart |