re: Ann: Initial Production Rate-1,207 Boe/d ... agentm,
OK, I have done some further investigation and I think I was mistaken to cast doubt on your figures. My apologies to you.
It looks like:
FD1 was the vertical well.
FD2H was a recompletion of the FD1 well where they added a horizontal leg.
This is all done under the same RRC permit number, apparently (all the filing of production numbers is under 684875, although there was some earlier documentation referring to 680481).
So the well name is interchangeable, but essentially we are looking at production figures for FD2H (which is what you were saying all along).
There is a bunch of documents (53 pages) for this lease that can be accessed using Wellbore Query (01 / McMullen / 745991), then clicking on the magnifying glass icon in the search results and following the links. None of it is very interesting however, it's just permitting and spatial coordinates surveys).
- Forums
- ASX - By Stock
- AZZ
- Ann: Initial Production Rate-1,207 Boe/d - France
Ann: Initial Production Rate-1,207 Boe/d - France, page-52
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online