To quote from the announcement:
'the first batch of MEMS devices received from the fab deviated from the required voltage specifications'
and
'The company has instructed its fab to urgently advance the backup wafer lots with the inclusion of the design change'
and
'The company plans to further update the market when the fabs return from holiday break with detailed timelines.'
Nothing is fixed yet.
- Forums
- ASX - By Stock
- AKP
- Ann: Integration Stage Update
Ann: Integration Stage Update, page-19
-
- There are more pages in this discussion • 138 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
Add AKP (ASX) to my watchlist
|
|||||
Last
$6.20 |
Change
0.000(0.00%) |
Mkt cap ! $181.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
AKP (ASX) Chart |
Day chart unavailable