With the limited drilling focused on resource expansion in the last drilling Phase IV round (only about 1500 metres), this is a fabulous result.
We now have a clear indication of how consistently successful drilling at Sorby Hills is and how easy it is to increase the mine size and mining reserve inventory.
Phase V could very likely deliver us a DOUBLING of the mining reserve inventory and mine size (throughput) and a commensurate increase in the global MRE.
How? We have an Initial mine size of 15MT now with an added 4 MT Reserve from 1500 m drilling. An additional amount potentially up to 16 MT Reserve extra (and a commensurate increase in global MRE) from the next Phase V 6000m which is targeted only for this purpose is a walk in the park.
Bigger Mine. Longer Life.
Monster Mine here we come.
V
- Forums
- ASX - By Stock
- BML
- Ann: Interim Mineral Resource Estimate
Ann: Interim Mineral Resource Estimate, page-5
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BML (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.33M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 10.0¢ | $250 | 2.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 275158 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 27805 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2399 | 0.105 |
9 | 275259 | 0.100 |
2 | 108100 | 0.098 |
1 | 20833 | 0.096 |
2 | 55131 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 500 | 1 |
0.100 | 2000 | 1 |
0.105 | 27805 | 2 |
0.110 | 95238 | 1 |
0.115 | 138000 | 3 |
Last trade - 10.00am 04/10/2024 (20 minute delay) ? |
Featured News
BML (ASX) Chart |