MOH 0.00% 0.5¢ moho resources limited

Ann: Interim Mineral Resource Estimate, page-19

  1. 1,380 Posts.
    lightbulb Created with Sketch. 226
    I believe the strategy to prove up a small starter pit is a good one. It allows us to generate cash earlier and minimise dilution from raising equity to drill out a larger resource. I don't think anyone doubts we have a larger resource sitting there waiting to extend.

    The table below shows we've got plenty of options to maximise value from different gold price scenarios.

    For example, if we used the 1.2g/t cut off instead of the 0.5g/t, we would bring the AISC way down by more than halving the tonnes to mine / transport / toll treat . There would be potential to mine 18koz over a year at potentially $1k per oz margins or $18m in free cash flow to drill out more resources and have a good crack at Empress Springs.

    (e.g $1450/oz AISC and AUD gold price $2450/oz)

    https://hotcopper.com.au/data/attachments/3379/3379541-55c7f33d366b647cfc256b5559e5db51.jpg






 
watchlist Created with Sketch. Add MOH (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $2.426M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
17 6140972 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 745046 1
View Market Depth
Last trade - 16.12pm 19/08/2024 (20 minute delay) ?
MOH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.