RDM 4.55% 11.5¢ red metal limited

Ann: Interim Phase 2 Metallurgy Green Lights Sybella REO, page-6

  1. 607 Posts.
    lightbulb Created with Sketch. 165
    At first read looks impressive, especially the fresh granite results, lower pH ( 3 ), with lower impurities and Nd extraction improving with heap leach time. And less crushing. Another step forward. But looking forward to BPP assessment.
 
watchlist Created with Sketch. Add RDM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.