2680 ppm of the initial findings is nothing to be shy away from.
"Basin’s maiden drilling program at Geikie consisted of eight (8) diamond drill holes for 2,217 metres (Figure 1) and was completed in August 2023. All geochemical assay results have now been received and the results are highly encouraging. "
Personally I am excited about so far.
What did everyone think were going to find as super thick 30,000 PPM @ 18% percent grade on the first Assay results.
Patience is required .
Personally, I am excited about North Millennium , right next door to the big boys.
- Forums
- ASX - By Stock
- BSN
- Ann: Intersects Uranium Mineralisation up to 0.27% at Geikie
Ann: Intersects Uranium Mineralisation up to 0.27% at Geikie, page-8
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add BSN (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.827M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 27411 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 51300 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 27411 | 0.032 |
1 | 17500 | 0.030 |
1 | 17928 | 0.028 |
1 | 19423 | 0.026 |
2 | 20000 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 51300 | 2 |
0.040 | 18998 | 1 |
0.072 | 124695 | 2 |
0.099 | 187568 | 2 |
0.100 | 30000 | 1 |
Last trade - 16.15pm 04/10/2024 (20 minute delay) ? |
Featured News
BSN (ASX) Chart |
Day chart unavailable