WTF, so in May last year they said it would be 3 months to decide on whether to sign the JV. Then that got pushed out numerous times. Then they release these new stages and say at the end of these stages they might sign a JV. And now stage 2 isn't even being decided on until December of this year?!!! So an actual JV is still probably a couple of years away?
What an absolute joke.
And what is FYI supposed to be doing in the meantime? Sitting around with their thumb up their a*se? Surely Alcoa are going to be taking the lead on the engineering stuff. They don't mention anything about the potash either that they have spend half a mill on in their last report.
I hold this stock, but I'm already down around 60% and the story just keeps getting worse.
- Forums
- ASX - By Stock
- CCM
- Ann: Investor Presentation - Brisbane Mining Conference
Ann: Investor Presentation - Brisbane Mining Conference, page-9
-
-
- There are more pages in this discussion • 179 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
0.001(1.61%) |
Mkt cap ! $23.36M |
Open | High | Low | Value | Volume |
6.4¢ | 6.9¢ | 6.2¢ | $14.68K | 227.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 173270 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.6¢ | 36438 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 173270 | 0.063 |
1 | 64769 | 0.062 |
2 | 35000 | 0.060 |
1 | 80000 | 0.059 |
1 | 8000 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.066 | 36438 | 1 |
0.067 | 130000 | 1 |
0.069 | 86206 | 3 |
0.070 | 110013 | 4 |
0.071 | 3000 | 1 |
Last trade - 15.18pm 15/07/2024 (20 minute delay) ? |
Featured News
CCM (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online