So I can almost estimate the top line revenue side based on the numbers I have seen.
100 Million tonne orebody
$US800 / tonne Spodumene Concentrate price.
What is the conversion factor of 1 tonne of Spodumene rock to Spodumene concentrate? I would presume it is some factor less than 1 !?
Trying to Google this metallurgical information and I am still feel uninformed.
I am trying to determine top line revenue potential. 100M * some factor? * $US800 = $US X
Once we have determined that I would be interested in trying to estimate profit per tonne of ore body.
While every ore body is going to be different based on location, what would be the usual rule of thumb expectation of cost to extract 1 T of Spodumene Concentrate?
Profit / tonne = ($US800 - Production Costs / tonne)
I did find this:
http://sayonamining.com.au/pre-feasibility-study
Am I reading this right? SYA have a resource of 10Mt and we have a resource of 80-100Mt?
$US300 per tonne?
- Forums
- ASX - By Stock
- NPM
- Ann: Investor Presentation (Canary Networks)
Ann: Investor Presentation (Canary Networks), page-8
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.166M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 78249 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 1070000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78249 | 0.014 |
1 | 75000 | 0.013 |
4 | 576000 | 0.012 |
2 | 500000 | 0.011 |
2 | 308000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 1070000 | 2 |
0.016 | 100500 | 2 |
0.017 | 183716 | 2 |
0.018 | 1446651 | 3 |
0.019 | 1803364 | 3 |
Last trade - 10.06am 06/08/2024 (20 minute delay) ? |
Featured News
NPM (ASX) Chart |
Day chart unavailable