SPQ 0.00% 1.0¢ superior resources limited

Ann: Investor Presentation - Greenvale Copper and Nickel, page-101

  1. 5,489 Posts.
    lightbulb Created with Sketch. 4024
    Eyeman, holes 5 and 6 results would be in.
    Holes 7, 8, 9 have been drilled.

    I don't think hole 5 and 6 results released because new holes 7, 8, 9 materially impact the earlier.

    Ie together as same structure.

    Hole 8, that's from the interpreted core into the known mineral run and ended where hole 5 started.

    The writing is on the wall already.

    To me large as the presentation told me they extended hole 8, 400m into the mineral trend.

    If mineralised that adds plus 600m strike w and nw.

    The angle, if mineralised, width as it goes across it.

    The presentation to me was to provide some new data that is not 100% ready.

    We can see by it, new holes 7, 8, 9 have been logged.

    Wet season comes up in a few months, not much of the 2.3m cash will get spent the next 6 months.

    This mineral found is profound. 700m plus widths, multiple repeat results, with drill spacings 200m.

    Also the drills end near the start points of others, so drilling really is much closer than 200m due to that and does cover the ground between them at various depths.
    Last edited by mode1971: 21/10/22
 
watchlist Created with Sketch. Add SPQ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $20.01M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $1.675K 167.4K

Buyers (Bids)

No. Vol. Price($)
1 21843 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 360000 1
View Market Depth
Last trade - 15.40pm 26/07/2024 (20 minute delay) ?
SPQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.