My thoughts are, if they couldn't successfully manage a small scale, turnkey operation like Murchison. Then what hope do they have of starting from scratch on a large scale? We have seen how they handle that with Andash.
The second thought is with the timeline. Nothing in that until the Fesibility study that can re-rate the sp. Thats 6months or more away. And drilling costs before that.
So when we relist, it will be at cash backing which is basically the $15mil sale proceeds from Andash (if it goes ahead).
Then the sp might fall as we spend it on drilling. $15mil wont go far. By the time we actually need the $185mil we will be below 10c. Considering we will probably open around 12-13c and hover around 10c the first week back.
Uphill battle. Even with a debt facility. I would think they need management changes to regain credibility and any chance of raising large sums. And I stil favour a cheaper new project as a starter.
- Forums
- ASX - By Stock
- KGL
- Ann: Investor Presentation - Jervois Project
Ann: Investor Presentation - Jervois Project , page-4
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $59.56M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.5¢ | $2.039K | 19.42K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 452236 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 86948 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 458250 | 0.100 |
1 | 5107 | 0.098 |
2 | 32777 | 0.095 |
1 | 10763 | 0.092 |
1 | 6000 | 0.091 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 86948 | 1 |
0.110 | 35841 | 1 |
0.115 | 26090 | 2 |
0.120 | 242684 | 1 |
0.140 | 47749 | 3 |
Last trade - 12.35pm 26/06/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |