My thoughts are, if they couldn't successfully manage a small scale, turnkey operation like Murchison. Then what hope do they have of starting from scratch on a large scale? We have seen how they handle that with Andash.
The second thought is with the timeline. Nothing in that until the Fesibility study that can re-rate the sp. Thats 6months or more away. And drilling costs before that.
So when we relist, it will be at cash backing which is basically the $15mil sale proceeds from Andash (if it goes ahead).
Then the sp might fall as we spend it on drilling. $15mil wont go far. By the time we actually need the $185mil we will be below 10c. Considering we will probably open around 12-13c and hover around 10c the first week back.
Uphill battle. Even with a debt facility. I would think they need management changes to regain credibility and any chance of raising large sums. And I stil favour a cheaper new project as a starter.
- Forums
- ASX - By Stock
- Ann: Investor Presentation - Jervois Project
My thoughts are, if they couldn't successfully manage a small...
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
-0.003(3.00%) |
Mkt cap ! $62.86M |
Open | High | Low | Value | Volume |
9.7¢ | 9.7¢ | 9.7¢ | $500 | 5.154K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 65184 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.096 |
1 | 102000 | 0.095 |
1 | 100000 | 0.093 |
3 | 210761 | 0.092 |
1 | 92088 | 0.091 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 65184 | 1 |
0.105 | 25000 | 1 |
0.110 | 45864 | 3 |
0.115 | 100000 | 1 |
0.120 | 736648 | 6 |
Last trade - 15.05pm 30/09/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |