My thoughts are, if they couldn't successfully manage a small scale, turnkey operation like Murchison. Then what hope do they have of starting from scratch on a large scale? We have seen how they handle that with Andash.
The second thought is with the timeline. Nothing in that until the Fesibility study that can re-rate the sp. Thats 6months or more away. And drilling costs before that.
So when we relist, it will be at cash backing which is basically the $15mil sale proceeds from Andash (if it goes ahead).
Then the sp might fall as we spend it on drilling. $15mil wont go far. By the time we actually need the $185mil we will be below 10c. Considering we will probably open around 12-13c and hover around 10c the first week back.
Uphill battle. Even with a debt facility. I would think they need management changes to regain credibility and any chance of raising large sums. And I stil favour a cheaper new project as a starter.
- Forums
- ASX - By Stock
- Ann: Investor Presentation - Jervois Project
My thoughts are, if they couldn't successfully manage a small...
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
-0.001(1.01%) |
Mkt cap ! $63.51M |
Open | High | Low | Value | Volume |
9.9¢ | 9.9¢ | 9.8¢ | $9.839K | 100K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9893 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 118277 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9893 | 0.098 |
1 | 21000 | 0.096 |
2 | 84292 | 0.095 |
1 | 106000 | 0.094 |
1 | 5376 | 0.093 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 118277 | 2 |
0.110 | 38095 | 1 |
0.115 | 99999 | 1 |
0.120 | 786648 | 7 |
0.140 | 28000 | 1 |
Last trade - 10.26am 04/11/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |