yes SC that makes a lot of sense.
As does restarting the mill with NP at 8.50 when costs are 3.00-4.00
(I exclude the 5.31 as this was before the SS refurb, ladders, aircon vents, DD & electricals)
https://www.asx.com.au/asxpdf/20140813/pdf/42rfxsgjq47fmx.pdf
The mine plan has been since 2014 to start 1.1MTpa mill with 10-14ktpa concentrate.
Nothing new here except-
- $20M spent already & SS refubished to 1000m level
- GS ST have added more high grade blocks
- DD built
- SS DFS 2018 proved its a go & doubled the resources
- where the ore will come from, W BS SS GS ST
- AUD drop makes it cheaper
- NP doubling to 8.50 makes it way more profitable.
Its sitting on a plate to start up.
- Forums
- ASX - By Stock
- Ann: Investor Presentation - Noosa Mining Conference
yes SC that makes a lot of sense. As does restarting the mill...
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $11.14M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $9.397K | 2.657M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
61 | 45048320 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 6330525 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
58 | 41667643 | 0.003 |
29 | 49305888 | 0.002 |
10 | 62798697 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 5814225 | 20 |
0.005 | 9351063 | 18 |
0.006 | 8769028 | 12 |
0.007 | 26022016 | 11 |
0.008 | 5500000 | 2 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |