POS 25.0% 0.5¢ poseidon nickel limited

yes SC that makes a lot of sense. As does restarting the mill...

  1. 9,773 Posts.
    lightbulb Created with Sketch. 4219
    yes SC that makes a lot of sense.

    As does restarting the mill with NP at 8.50 when costs are 3.00-4.00
    (I exclude the 5.31 as this was before the SS refurb, ladders, aircon vents, DD & electricals)

    https://www.asx.com.au/asxpdf/20140813/pdf/42rfxsgjq47fmx.pdf

    The mine plan has been since 2014 to start 1.1MTpa mill with 10-14ktpa concentrate.
    Nothing new here except-
    - $20M spent already & SS refubished to 1000m level
    - GS ST have added more high grade blocks
    - DD built
    - SS DFS 2018 proved its a go & doubled the resources
    - where the ore will come from, W BS SS GS ST
    - AUD drop makes it cheaper
    - NP doubling to 8.50 makes it way more profitable.

    Its sitting on a plate to start up.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.001(25.0%)
Mkt cap ! $18.56M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $9.661K 2.404M

Buyers (Bids)

No. Vol. Price($)
90 66568063 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 16479836 30
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.