From today's report.
Open pits are scheduled to deliver 1.2 Moz at 1.32 g/t gold and a low 3.7:1 (waste: ore) strip
ratio using an average weighted lower cut-off grade of 0.48 g/t gold.
Underground mining is scheduled to deliver 1.64 Moz (including underground
development material) at 3.55 g/t gold using an average weighted lower cut-off grade of
2.0 g/t gold