From today's report.
Open pits are scheduled to deliver 1.2 Moz at 1.32 g/t gold and a low 3.7:1 (waste: ore) strip
ratio using an average weighted lower cut-off grade of 0.48 g/t gold.
Underground mining is scheduled to deliver 1.64 Moz (including underground
development material) at 3.55 g/t gold using an average weighted lower cut-off grade of
2.0 g/t gold
- Forums
- ASX - By Stock
- Ann: Investor Presentation - Nyanzaga DFS
From today's report.Open pits are scheduled to deliver 1.2 Moz...
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ORR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online