From today's report.
Open pits are scheduled to deliver 1.2 Moz at 1.32 g/t gold and a low 3.7:1 (waste: ore) strip
ratio using an average weighted lower cut-off grade of 0.48 g/t gold.
Underground mining is scheduled to deliver 1.64 Moz (including underground
development material) at 3.55 g/t gold using an average weighted lower cut-off grade of
2.0 g/t gold
- Forums
- ASX - By Stock
- Ann: Investor Presentation - Nyanzaga DFS
From today's report.Open pits are scheduled to deliver 1.2 Moz...
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)