ETM 4.17% 2.3¢ energy transition minerals ltd

Ann: Investor Presentation, page-10

  1. 3,002 Posts.
    lightbulb Created with Sketch. 503
    I would say that this is what the market picked up on in the presentation - no mention about the timing of the mining license. I guess until the EIA / SIA are closed out and the public hearings commence,we won't know for certain and the share price will reflect that- hopefully over the coming months we get more clarity!

    That being said, the presentation was excellent and it's full steam ahead and no turning back!

    "Q4 ‐ 2017  Updated Environmental Impact Assessment incorporating
    additional data and studies conducted through 2017
    Q1 ‐ 2018
     Project update drawing on test work conducted jointly with
    Shenghe through 2017; addresses optimisation and integration
    with downstream processing
     Commence update of Feasibility Study (2016)
    Q2 ‐ 2018
     Update operating costs
     Incorporate updated workforce requirements into SIA, conduct
    required EIA revisions that arise from optimisation
    Q3 ‐ 2018  Pilot plant operation of final configuration
    Q4 ‐ 2018
     Finalise Feasibility Study
     Revise capital costs"

    (Still a lot of work to do before production commences)
 
watchlist Created with Sketch. Add ETM (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.001(4.17%)
Mkt cap ! $32.40M
Open High Low Value Volume
2.4¢ 2.4¢ 2.3¢ $3.922K 163.4K

Buyers (Bids)

No. Vol. Price($)
1 189931 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 228329 7
View Market Depth
Last trade - 16.10pm 17/09/2024 (20 minute delay) ?
ETM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.